CALIBRATION PANEL PROJECT
This project was a three phase project, and I wanted to showcase some of the hand skills as well as detail in full some of the work I have done on this project. The main idea behind this project was to test the old calibration panel, wire the panel, and then test the new panel so we could compare the results.
The first phase involved me testing and gathering data from the old calibration panel. The pertinent data was then organized into a .CSV file from a .DAT file via a python script that I wrote. This same process was done after the second panel was wired, and the data was sent off to another team to be compared to each other.
The wiring was also done by me. I was required to read an electrical drawing, solder wires together as well as to connectors, and crimp wires.